• Home
  • Projects
  • About Us
  • Service
  • Download
  • Contact Us

Thousands Real Projects Show

Exported To More Than 150 Countries

Case Study: 1,000 sqm Indoor Amusement Park Project in Gabon – Turnkey Solution from Design to Installation

Project Overview​​ ​​Client:​​ Educational/Entertainment Facility in Gabon ​​Scope:​​ Complete design, manufacturing, logistics, and installation of a 1,000 sqm indoor amusement park ​​Key Highlights:​​ ✅ End-to-end project management ✅ Engineer-supervised local team training ✅ Safety-certified structures & materials ​​Phase 1: Collaborative Design & Planning​​ Strategic Zoning Approach​​: ​​Left Zone (22×20m)​​: Interactive play structures: Maze passages, ball […]

Project Overview​​

​​Client:​​ Educational/Entertainment Facility in Gabon
​​Scope:​​ Complete design, manufacturing, logistics, and installation of a 1,000 sqm indoor amusement park
​​Key Highlights:​​
✅ End-to-end project management
✅ Engineer-supervised local team training
✅ Safety-certified structures & materials


​​Phase 1: Collaborative Design & Planning​​

Strategic Zoning Approach​​:

  1. ​​Left Zone (22×20m)​​:
    • Interactive play structures: Maze passages, ball pits, palm-tree decorations
    • Skill-development features: Climbing nets and themed playhouses
  2. ​​Central Corridor (5m width)​​:
    • Supervisory area with tables/chairs for guardians
  3. ​​Right Zone (20×20m)​​:
    • Foam-bead soft play arena with slides and climbing walls
    • Centerpiece circular climbing structure

​​Design Innovation​​: Tropical color palette (blue/yellow/green) with clear flow pathways ensuring safety and engagement.


​​Phase 2: Precision Manufacturing & Logistics​​

Engineering Excellence​​:

  • ​​Modular Frame System​​: Pre-drilled metal pipes with color-coded yellow connectors
  • ​​Safety-First Attractions​​:
    • Devil Slide : Angled red slide with safety railings
    • Checkered Stairs  Non-slip green/white steps with grip circles
  • ​​Certified Materials​​: Shock-absorbent blue flooring foam (EN 1177 standard)

​​Supply Chain Efficiency​​: Container-optimized packaging for ocean freight to Gabon.


​​Phase 3: On-Site Installation & Training​​

​Engineer-Led Workflow​​:

  1. ​​Frame Assembly ​​:
    • Local workers guided in structural trial erection
    • Tool deployment: Torque wrenches + safety cones
  2. ​​Attraction Integration ​​:
  3. ​​Quality Validation:
    • Engineer testing slide structural integrity
    • 360° safety checks on padding/anchoring

​​Knowledge Transfer​​: Daily briefings on maintenance protocols and safety inspections.


​​Why Global Clients Choose Our Turnkey Model​​

  • 🌍 ​​Africa-Proven Expertise​​: Climate-adapted materials (UV-resistant/high-humidity)
  • 👷 ​​Local Empowerment​​: Trained 15+ Gabonese workers in assembly/maintenance
  • 📦 ​​Logistics Mastery​​: Damage-free delivery rate: 99.3%
  • 📞 ​​Real-Time Support​​: Installation hotline for troubleshooting

​​Invitation to Collaborate​​

Whether you’re developing kindergartens, malls, or family entertainment centers, our integrated service covers:

  • ​​3D Design Rendering​​
  • ​​Domestic Production​​
  • ​​Doorstep Delivery + Installation​

Related Products

Get catalog, please leave your message

Email
Email:gzhappyplay@163.com
WhatsApp
WhatsApp QR Code
WhatsApp
WhatsApp
WhatsApp QR Code